Case Studies

Select a case study that provides a window into industry solutions for automation, process control and project management. The studies include information about objectives, strategies, challenges, results and suggestions.

Entries tagged [lighting]

Re-Lamping of Casting Manufacturing Facility Results in Reduced Energy Costs and Increase in Parts Inspection Efficiency

Museum Lighting Project The T8 lamps that were currently installed in the factory needed to be replaced frequently. This slowed down production and hindered parts inspection. The manufacturer was looking to upgrade their lighting either with completely new fixtures or a LED re-lamping in current fixtures. ... {Read More}

MUSEUM LED LIGHTING UPGRADE RESULTS IN REDUCING ENERGY COSTS

Posted on Tuesday Apr 10, 2018 | bulbs, incandescent, lamps, led, lighting, lights, roi,

Museum Lighting Project The museum was looking for a better way to light their artwork than the existing incandescent lamps. The incandescent lamps needed to be replaced frequently which required a great deal of time by maintenance personnel. With the amount of inventory that needed to be kept on hand by the museum, the museum incurred high stock and maintenance costs. ... {Read More}

AIR HANDLING SYSTEM DRIVES APPLICATION

Posted on Sunday May 17, 2015 | drives, lighting, micrologix, powerflex,

Apartment Complex Illustration The property management company was looking for ways to reduce fixed costs and begin conversion to meet LEED Building standards and receive utility rebates as a result. The primary focus of this project was to reduce energy usage and take advantage of state utility rebate programs. The primary air handling system for the building was made up of a 150HP motor for supply air and a 100HP motor for return air.... {Read More}